GroundStop.app

Ground stop at Teterboro (TEB), Nov 22, 2026

EndedLow clouds halt departures from Teterboard for two hours
Started
20:15 UTC
Ended
22:17 UTC
Duration
2 hr 2 min
Cause
low ceilings
Extended 1 time

Check your flight

Enter your flight number to see its EDCT, the ground stop or delay program at its destination, and its status.

What happened

AI-written · may contain mistakes. Written from the advisory text and weather only.

Cause: Low cloud ceilings and mist at Teterboro made landings and takeoffs unsafe, so air traffic control held departures bound for the airport from many centers.

The ground stop began at 20:15 UTC and was extended at 21:15 UTC, with the end time pushed to 5:30 pm EST. It ended at 22:17 UTC, after 2 hours 2 minutes, before the extended end time.

Impact by airline

No airline data was collected for this ground stop.

Airline numbers appear after the first sample, within about 20 minutes of the start.

Impact by region

Air traffic control centers whose departures to the airport were held.
CenterStatus
ZAUHeld
ZTLHeld
ZDCHeld
ZNYHeld
ZJXHeld
ZOBHeld
ZBWHeld
ZMAHeld
ZIDHeld
ZMPHeld

Timeline

Every change published while the ground stop was in effect, as seen each minute.
  1. Ground stop issued at TEB for low ceilings, until 4:30 pm EST. Departures held from ZAU, ZTL, ZDC, ZNY and 6 more.

  2. Extended until 5:30 pm EST.

  3. New advisory issued.

    Read the advisory ↗
  4. Ground stop ended after 2 hr 2 min.

Advisories

The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 116 TEB/ZNY 11/22/2026 CDM GROUND STOP
CTL ELEMENT: TEB
ELEMENT TYPE: APT
ADL TIME: 2108Z
GROUND STOP PERIOD: 22/2000Z - 22/2230Z
DEP FACILITIES INCLUDED: (Manual) ZAU ZTL ZDC ZNY ZJX ZOB ZBW ZMA ZID
 ZMP  CYHZ CYOW CYUL CYYZ CYTZ CYQB
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 2076 / 142 / 45
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 4520 / 202 / 98
PROBABILITY OF EXTENSION: HIGH
IMPACTING CONDITION: WEATHER / LOW CEILINGS
COMMENTS:
Original advisory ↗
ATCSCC ADVZY 110 TEB/ZNY 11/22/2026 CDM GROUND STOP
CTL ELEMENT: TEB
ELEMENT TYPE: APT
ADL TIME: 2008Z
GROUND STOP PERIOD: 22/2000Z - 22/2130Z
DEP FACILITIES INCLUDED: (Manual) ZAU ZTL ZDC ZNY ZJX ZOB ZBW ZMA ZID
 ZMP  CYHZ CYOW CYUL CYYZ CYTZ CYQB
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 819 / 82 / 20
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 2845 / 142 / 69
PROBABILITY OF EXTENSION: HIGH
IMPACTING CONDITION: WEATHER / LOW CEILINGS
COMMENTS: SCOPE EXPANDED AND STOP EXTENDED.
Original advisory ↗

How it is measured

Data sources are listed on the credits page.