GroundStop.app

Ground stop at Teterboro (TEB), Nov 12, 2026

EndedStaffing shortage halts Teterboro departures for 45 minutes
Started
00:44 UTC
Ended
01:29 UTC
Duration
45 min
Cause
STAFFING

Check your flight

Enter your flight number to see its EDCT, the ground stop or delay program at its destination, and its status.

What happened

AI-written · may contain mistakes. Written from the advisory text and weather only.

Cause: Air traffic control staffing was short, so departures were held. Light rain and a nearby storm advisory were also in the area at the time.

The ground stop began at 00:44 UTC on November 13, holding departures from four air traffic control centers. At 00:54 UTC, departures from one of those centers were released, and a new advisory followed a minute later. The stop ended at 01:29 UTC, after 45 minutes.

Impact by airline

Flights to and from TEB delayed 30+ minutes during the ground stop and the hour after it.
Delayed 30+ min
0
Arrivals / departures
0 / 0

Airline numbers appear after the first sample, within about 20 minutes of the start.

Impact by region

Delayed arrivals by the air traffic control center they departed from. Held: departures from that center were stopped.

Aircraft at the airport

Peak 18 on the ground, 0 holding nearby.
09187:45 PM8:02 PM

On the ground Holding nearby

Timeline

Every change published while the ground stop was in effect, as seen each minute.
  1. Ground stop issued at TEB for staffing, until 8:30 pm EST. Departures held from ZDC, ZNY, ZOB, ZBW.

  2. Scope narrowed: departures from ZNY released.

  3. New advisory issued.

    Read the advisory ↗
  4. Ground stop ended after 45 min.

Advisories

The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 008 TEB/ZNY 11/13/2026 CDM GROUND STOP
CTL ELEMENT: TEB
ELEMENT TYPE: APT
ADL TIME: 0048Z
GROUND STOP PERIOD: 13/0038Z - 13/0130Z
DEP FACILITIES INCLUDED: (Manual) ZDC ZOB ZBW  CYHZ CYOW CYUL CYYZ
 CYTZ CYQB
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 116 / 50 / 39
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 116 / 50 / 39
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: STAFFING / STAFFING
COMMENTS: REMOVED ZNY FROM GROUND STOP.
Original advisory ↗
ATCSCC ADVZY 006 TEB/ZNY 11/13/2026 CDM GROUND STOP
CTL ELEMENT: TEB
ELEMENT TYPE: APT
ADL TIME: 0040Z
GROUND STOP PERIOD: 13/0030Z - 13/0130Z
DEP FACILITIES INCLUDED: (Manual) ZDC ZNY ZOB ZBW  CYHZ CYOW CYUL
 CYYZ CYTZ CYQB
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 1259 / 56 / 43
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: STAFFING / STAFFING
COMMENTS:
Original advisory ↗

How it is measured

Data sources are listed on the credits page.