GroundStop.app

Ground stop at Teterboro (TEB), Oct 28, 2026

EndedStaffing problems halt departures from Teterboro for 79 minutes
Started
20:47 UTC
Ended
22:06 UTC
Duration
1 hr 19 min
Cause
STAFFING
Extended 1 time

Check your flight

Enter your flight number to see its EDCT, the ground stop or delay program at its destination, and its status.

What happened

AI-written · may contain mistakes. Written from the advisory text and weather only.

Cause: Air traffic control staffing problems led to the ground stop, holding flights out of Teterboro until controllers could handle them again.

The ground stop began at 20:47 UTC, first citing compacted traffic and then airport volume, before being changed to staffing at 21:24 UTC and extended to 6:30 pm Eastern. It ended at 22:06 UTC, after 1 hour 19 minutes, before the extended time. Departures had been held from nine air traffic control centers.

Impact by airline

No airline data was collected for this ground stop.

Airline numbers appear after the first sample, within about 20 minutes of the start.

Impact by region

Air traffic control centers whose departures to the airport were held.
CenterStatus
ZAUHeld
ZTLHeld
ZDCHeld
ZNYHeld
ZJXHeld
ZOBHeld
ZBWHeld
ZIDHeld
ZMPHeld

Timeline

Every change published while the ground stop was in effect, as seen each minute.
  1. Ground stop issued at TEB for compacted, until 5:45 pm EDT. Departures held from ZAU, ZTL, ZDC, ZNY and 5 more.

  2. Reason changed to airport volume.

  3. New advisory issued.

    Read the advisory ↗
  4. Reason changed to staffing.

  5. Extended until 6:30 pm EDT.

  6. Ground stop ended after 1 hr 19 min.

Advisories

The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 065 TEB/ZNY 10/28/2026 CDM GROUND STOP
CTL ELEMENT: TEB
ELEMENT TYPE: APT
ADL TIME: 2116Z
GROUND STOP PERIOD: 28/2106Z - 28/2230Z
DEP FACILITIES INCLUDED: (Manual) ZAU ZTL ZDC ZNY ZJX ZOB ZBW ZID ZMP
  CYHZ CYOW CYUL CYYZ CYTZ CYQB
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 760 / 64 / 33
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 1739 / 109 / 76
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: STAFFING / STAFFING
COMMENTS: EXPECT A GDP TO EXIT THE GROUND STOP.
Original advisory ↗
ATCSCC ADVZY 061 TEB/ZNY 10/28/2026 CDM GROUND STOP
CTL ELEMENT: TEB
ELEMENT TYPE: APT
ADL TIME: 2041Z
GROUND STOP PERIOD: 28/2031Z - 28/2145Z
DEP FACILITIES INCLUDED: (Manual) ZAU ZTL ZDC ZNY ZJX ZOB ZBW ZID ZMP

PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 1227 / 69 / 45
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: VOLUME / COMPACTED DEMAND
COMMENTS:
Original advisory ↗

How it is measured

Data sources are listed on the credits page.