GroundStop.app

Ground stop at Seattle-Tacoma (SEA), Nov 12, 2026

EndedConstruction halts Seattle departures for 19 minutes
Started
01:26 UTC
Ended
01:45 UTC
Duration
19 min
Cause
other

Check your flight

Enter your flight number to see its EDCT, the ground stop or delay program at its destination, and its status.

What happened

AI-written · may contain mistakes. Written from the advisory text and weather only.

Cause: Construction work at Seattle-Tacoma and nearby Boeing Field led air traffic control to briefly stop flights from leaving Seattle. Weather was not the cause.

The ground stop began at 01:26 UTC on November 13 and was set to run until 02:00 UTC. Departures were held from three air traffic control centers, including Salt Lake City, Oakland and Seattle centers. It ended at 01:45 UTC, after 19 minutes, and was not extended. A ground delay program was expected to follow.

Impact by airline

Aircraft seen on the ground at SEA and holding nearby, by airline.
AirlineOn groundHolding
Alaska Airlines AS9—
Delta Air Lines DL5—
Horizon Air QX2—
American Airlines AA1—
Empire Airlines PN1—
Frontier Airlines F91—
SkyWest Airlines OO1—
United Airlines UA1—

Impact by region

Air traffic control centers whose departures to the airport were held.

Aircraft at the airport

Peak 19 on the ground, 0 holding nearby.
010195:33 PM5:40 PM

On the ground Holding nearby

Timeline

Every change published while the ground stop was in effect, as seen each minute.
  1. Ground stop issued at SEA for other, until 6:00 pm PST. Departures held from ZLC, ZOA, ZSE.

  2. Ground stop ended after 19 min.

Advisories

The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 010 SEA/ZSE 11/13/2026 CDM GROUND STOP
CTL ELEMENT: SEA
ELEMENT TYPE: APT
ADL TIME: 0121Z
GROUND STOP PERIOD: 13/0106Z - 13/0200Z
DEP FACILITIES INCLUDED: (Manual) ZLC ZOA ZSE  CYEG CYVR CYYC CYYJ
 CYLW
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 213 / 37 / 18
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: OTHER / OTHER
COMMENTS: CONSTRUCTION AT SEA AND BFI. GDP TO FOLLOW.
Original advisory ↗

How it is measured

Data sources are listed on the credits page.