GroundStop.app

Ground stop at Seattle-Tacoma (SEA), Oct 15, 2026

ActiveRunway construction halts departures to Seattle-Tacoma airport
Started
02:18 UTC
Scheduled until
8:30 pm PDT
In effect for
44 min
Cause
runway construction

Live: this page updates every minute while the ground stop is in effect.

Flying to or from SEA? Is your flight affected?

Enter your flight number to see its EDCT, the ground stop or delay program at its destination, and its status.

What happened

AI-written · may contain mistakes. Written from the advisory text and weather only.

Cause: Construction work on the runways at Seattle-Tacoma led air traffic control to hold flights that were due to leave for the airport.

The ground stop began at 02:18 UTC on October 16 and was still in effect 16 minutes later. Departures from four air traffic control centers were held, and the stop was set to run until 03:30 UTC. Air traffic control said an extension was unlikely, and delays grew as flights were held.

Impact by airline

Aircraft seen on the ground at SEA and holding nearby, by airline.
AirlineOn groundHolding
Alaska Airlines AS9—
Delta Air Lines DL5—
Horizon Air QX4—
SkyWest Airlines OO3—
American Airlines AA2—
FedEx Express FX2—
United Airlines UA2—
Air Canada AC1—
Aeroméxico AM1—
British Airways BA1—
China Airlines CI1—
Lufthansa LH1—
Aer Lingus EI1—
Frontier Airlines F91—
Philippine Airlines PR1—

Impact by region

Air traffic control centers whose departures to the airport were held.

Aircraft at the airport

Peak 33 on the ground, 0 holding nearby.
017337:19 PM7:50 PM

On the ground Holding nearby

Timeline

Every change published while the ground stop was in effect, as seen each minute.
  1. Ground stop issued at SEA for rwy, until 8:30 pm PDT. Departures held from ZLA, ZLC, ZOA, ZSE.

  2. Reason changed to runway construction.

  3. Chance of extension now low.

Advisories

The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 014 SEA/ZSE 10/16/2026 CDM GROUND STOP
CTL ELEMENT: SEA
ELEMENT TYPE: APT
ADL TIME: 0213Z
GROUND STOP PERIOD: 16/0215Z - 16/0330Z
DEP FACILITIES INCLUDED: (Manual) ZLA ZLC ZOA ZSE
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 946 / 71 / 38
PROBABILITY OF EXTENSION: LOW
IMPACTING CONDITION: RWY-TAXI / CONSTRUCTION
COMMENTS:
Original advisory ↗

How it is measured

Data sources are listed on the credits page.