GroundStop.app

Ground stop at Boston Logan (BOS), Nov 7, 2026

EndedRunway construction halts Boston departures for 38 minutes
Started
19:07 UTC
Ended
19:45 UTC
Duration
38 min
Cause
runway construction

Check your flight

Enter your flight number to see its EDCT, the ground stop or delay program at its destination, and its status.

What happened

AI-written · may contain mistakes. Written from the advisory text and weather only.

Cause: Runway and taxiway construction at Boston Logan, along with low clouds, drizzle and fog, led air traffic control to hold departures.

The ground stop began at 19:07 UTC on November 7 and ended at 19:45 UTC, lasting 38 minutes. Departures were held from four air traffic control centers. An advisory had warned of a medium chance of extension and a likely revision to delays.

Impact by airline

Aircraft seen on the ground at BOS and holding nearby, by airline.
AirlineOn groundHolding
Delta Air Lines DL3—
Republic Airways YX3—
United Airlines UA3—
American Airlines AA2—
JetBlue B62—
Envoy Air MQ1—
Jazz QK1—
Cape Air KS1—
Porter Airlines PD1—
Southwest Airlines WN1—
TAP Air Portugal TP1—

Impact by region

Air traffic control centers whose departures to the airport were held.

Aircraft at the airport

Peak 14 on the ground, 0 holding nearby.
07142:08 PM2:42 PM

On the ground Holding nearby

Timeline

Every change published while the ground stop was in effect, as seen each minute.
  1. Ground stop issued at BOS for runway construction, until 3:15 pm EST. Departures held from ZDC, ZNY, ZOB, ZBW.

  2. Ground stop ended after 38 min.

Advisories

The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 066 BOS/ZBW 11/07/2026 CDM GROUND STOP
CTL ELEMENT: BOS
ELEMENT TYPE: APT
ADL TIME: 1902Z
GROUND STOP PERIOD: 07/1847Z - 07/2015Z
CUMULATIVE PROGRAM PERIOD: 07/1800Z - 08/0259Z
DEP FACILITIES INCLUDED: (1stTier+CZY_AP) ZDC ZNY ZOB ZBW  CYHZ CYOW
 CYUL CYYZ CYTZ CYQB
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 455 / 94 / 38
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 869 / 115 / 72
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: RWY-TAXI / CONSTRUCTION
COMMENTS: ADDITIONAL CONSTRAINT LOW CEILINGS.  GDP REVISION PROBABLE
Original advisory ↗

How it is measured

Data sources are listed on the credits page.