What happened
AI-written · may contain mistakes. Written from the advisory text and weather only.
Cause: Flights bound for Boston Logan were held because of runway and taxiway construction, according to the stated reason. Weather at the time was calm.
The ground stop began at 7:55 p.m. UTC on October 14, 2026, holding departures bound for Boston Logan from four air traffic control centers. It ended at 8:41 p.m. UTC, after 46 minutes. An advisory had listed a medium chance of extension, but no extension was recorded.
Impact by airline
Aircraft seen on the ground at BOS and holding nearby, by airline.
| Airline | On ground | Holding |
|---|---|---|
| JetBlue B6 | 15 | — |
| Delta Air Lines DL | 4 | — |
| Republic Airways YX | 4 | — |
| American Airlines AA | 2 | — |
| Air Canada AC | 1 | — |
| Copa Airlines CM | 1 | — |
| Lufthansa LH | 1 | — |
| Cape Air KS | 1 | — |
| Qatar Airways QR | 1 | — |
| Southwest Airlines WN | 1 | — |
| Swiss LX | 1 | — |
| United Airlines UA | 1 | — |
Impact by region
Air traffic control centers whose departures to the airport were held.
| Center | Status |
|---|---|
| Boston Center (ZBW) | Held |
| Washington Center (ZDC) | Held |
| New York Center (ZNY) | Held |
| Cleveland Center (ZOB) | Held |
Aircraft at the airport
Peak 36 on the ground, 0 holding nearby.
On the ground Holding nearby
Timeline
Every change published while the ground stop was in effect, as seen each minute.
Ground stop issued at BOS for runway construction, until 5:00 pm EDT. Departures held from ZDC, ZNY, ZOB, ZBW.
Ground stop ended after 46 min.
Advisories
The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 083 BOS/ZBW 10/14/2026 CDM GROUND STOP
CTL ELEMENT: BOS ELEMENT TYPE: APT ADL TIME: 1952Z GROUND STOP PERIOD: 14/1937Z - 14/2100Z CUMULATIVE PROGRAM PERIOD: 14/1730Z - 15/0359Z DEP FACILITIES INCLUDED: (Manual) ZDC ZNY ZOB ZBW CYHZ CYOW CYUL CYYZ CYTZ CYQB PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 921 / 120 / 51 NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 1556 / 136 / 86 PROBABILITY OF EXTENSION: MEDIUM IMPACTING CONDITION: RWY-TAXI / CONSTRUCTION COMMENTS: THE GDP WILL BE REVISED FOLLOWING THE GROUND STOPOriginal advisory ↗