GroundStop.app

Ground stop at BFI (BFI), Nov 5, 2026

EndedConstruction at BFI halts departures for 42 minutes
Started
21:22 UTC
Ended
22:04 UTC
Duration
42 min
Cause
other

Check your flight

Enter your flight number to see its EDCT, the ground stop or delay program at its destination, and its status.

What happened

AI-written · may contain mistakes. Written from the advisory text and weather only.

Cause: Flights were held because of construction on the airport's control tower, according to the advisory, though the official reason was listed only as other.

On November 5, 2026, departures were held from four air traffic control centers starting at 21:22 UTC. A new advisory was issued at 21:24 UTC, and the stop ended at 22:04 UTC after 42 minutes. The advisory reported 562 total delays, with a maximum of 75 minutes and an average of 56 minutes.

Impact by airline

No airline data was collected for this ground stop.

Airline numbers appear after the first sample, within about 20 minutes of the start.

Impact by region

Air traffic control centers whose departures to the airport were held.
CenterStatus
ZLAHeld
ZLCHeld
ZOAHeld
ZSEHeld

Timeline

Every change published while the ground stop was in effect, as seen each minute.
  1. Ground stop issued at BFI for other, until 2:30 pm PST. Departures held from ZLA, ZLC, ZOA, ZSE.

  2. Reason changed to other.

  3. New advisory issued.

    Read the advisory ↗
  4. Ground stop ended after 42 min.

Advisories

The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 048 BFI/ZSE 11/05/2026 CDM GROUND STOP
CTL ELEMENT: BFI
ELEMENT TYPE: APT
ADL TIME: 2121Z
GROUND STOP PERIOD: 05/2106Z - 05/2230Z
DEP FACILITIES INCLUDED: (Manual) ZLA ZLC ZOA ZSE  CYEG CYVR CYYC
 CYYJ CYLW
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 562 / 75 / 56
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: OTHER / OTHER
COMMENTS: BFI TOWER CONSTRUCTION
Original advisory ↗
ATCSCC ADVZY 040 BFI/ZSE 11/05/2026 CDM GROUND STOP
CTL ELEMENT: BFI
ELEMENT TYPE: APT
ADL TIME: 1910Z
GROUND STOP PERIOD: 05/1835Z - 05/2015Z
DEP FACILITIES INCLUDED: (Manual) ZLC ZOA ZSE  CYEG CYVR CYYC CYYJ
 CYLW
PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0
NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 214 / 72 / 54
PROBABILITY OF EXTENSION: MEDIUM
IMPACTING CONDITION: OTHER / OTHER
COMMENTS: TOWER CONSTRUCTION.
Original advisory ↗

How it is measured

Data sources are listed on the credits page.