What happened
AI-written · may contain mistakes. Written from the advisory text and weather only.
Cause: Construction work on the airport tower led air traffic control to stop flights from taking off.
The ground stop began at 19:16 UTC on November 5, 2026. At 19:18 UTC it widened to hold departures from three air traffic control centers, and the chance of extension was rated medium. It ended at 19:51 UTC, after 35 minutes.
Impact by airline
No airline data was collected for this ground stop.
Airline numbers appear after the first sample, within about 20 minutes of the start.
Impact by region
Air traffic control centers whose departures to the airport were held.
Timeline
Every change published while the ground stop was in effect, as seen each minute.
Ground stop issued at BFI for other, until 12:15 pm PST.
Reason changed to other.
Chance of extension now medium.
Departures held from ZLC, ZOA, ZSE.
Ground stop ended after 35 min.
Advisories
The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 040 BFI/ZSE 11/05/2026 CDM GROUND STOP
CTL ELEMENT: BFI ELEMENT TYPE: APT ADL TIME: 1910Z GROUND STOP PERIOD: 05/1835Z - 05/2015Z DEP FACILITIES INCLUDED: (Manual) ZLC ZOA ZSE CYEG CYVR CYYC CYYJ CYLW PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0 NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 214 / 72 / 54 PROBABILITY OF EXTENSION: MEDIUM IMPACTING CONDITION: OTHER / OTHER COMMENTS: TOWER CONSTRUCTION.Original advisory ↗