What happened
AI-written · may contain mistakes. Written from the advisory text and weather only.
Cause: Runway and taxiway construction at Austin-Bergstrom led air traffic control to hold departures, even though skies were clear and winds were light.
The ground stop began at 22:06 UTC on November 16, 2026, and was scheduled to run until 5:00 pm CST. It ended at 22:51 UTC, after 45 minutes, and was not extended. Departures were held through one air traffic control center during that time.
Impact by airline
No airline data was collected for this ground stop.
Airline numbers appear after the first sample, within about 20 minutes of the start.
Impact by region
Air traffic control centers whose departures to the airport were held.
| Center | Status |
|---|---|
| ZHU | Held |
Timeline
Every change published while the ground stop was in effect, as seen each minute.
Ground stop issued at AUS for runway construction, until 5:00 pm CST. Departures held from ZHU.
Ground stop ended after 45 min.
Advisories
The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 071 AUS/ZHU 11/16/2026 CDM GROUND STOP
CTL ELEMENT: AUS ELEMENT TYPE: APT ADL TIME: 2201Z GROUND STOP PERIOD: 16/2151Z - 16/2300Z DEP FACILITIES INCLUDED: (Internal) ZHU PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0 NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 242 / 64 / 48 PROBABILITY OF EXTENSION: LOW IMPACTING CONDITION: RWY-TAXI / CONSTRUCTION COMMENTS:Original advisory ↗