What happened
AI-written · may contain mistakes. Written from the advisory text and weather only.
Cause: Construction on the runways and taxiways at Austin-Bergstrom airport led air traffic control to briefly stop flights from leaving for that airport.
The ground stop began at 19:08 UTC on November 16 and covered departures from seven air traffic control centers. Air traffic control later widened it to the full first tier of centers. It ended at 19:46 UTC, after 38 minutes, before its planned end time of 20:15 UTC.
Impact by airline
No airline data was collected for this ground stop.
Airline numbers appear after the first sample, within about 20 minutes of the start.
Impact by region
Air traffic control centers whose departures to the airport were held.
Timeline
Every change published while the ground stop was in effect, as seen each minute.
Ground stop issued at AUS for runway construction, until 2:15 pm CST. Departures held from ZTL, ZHU, ZJX, ZFW and 3 more.
Ground stop ended after 38 min.
Advisories
The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 054 AUS/ZHU 11/16/2026 CDM GROUND STOP
CTL ELEMENT: AUS ELEMENT TYPE: APT ADL TIME: 1905Z GROUND STOP PERIOD: 16/1855Z - 16/2015Z DEP FACILITIES INCLUDED: (1stTier) ZTL ZHU ZJX ZFW ZMA ZME ZAB PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 254 / 58 / 12 NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 1254 / 118 / 60 PROBABILITY OF EXTENSION: MEDIUM IMPACTING CONDITION: RWY-TAXI / CONSTRUCTION COMMENTS: LOW CEILINGS AND TAXIWAY CONSTRUCTION. EXPANDED TO FULL 1ST TIER.Original advisory ↗