What happened
AI-written · may contain mistakes. Written from the advisory text and weather only.
Cause: Runway construction at Austin's airport was the stated reason, and an advisory also noted low cloud ceilings as an added limit on flights.
The ground stop began at 18:11 UTC on November 16, holding departures from three air traffic control centers. It ended at 19:07 UTC, after 56 minutes, earlier than the 1:15 pm CST end time first announced. The advisory listed 534 total delays, with a maximum of 70 minutes and an average of 44.
Impact by airline
Flights to and from AUS delayed 30+ minutes during the ground stop and the hour after it.
- Delayed 30+ min
- 8
- Arrivals / departures
- 4 / 4
| Airline | Delayed | Avg delay |
|---|---|---|
| Southwest Airlines WN | 4 | 53 min |
| American Airlines AA | 2 | 35 min |
| SkyWest Airlines OO | 1 | 70 min |
| Viva Aerobus VB | 1 | 78 min |
Delayed 30+ min
Held at origin
Flights to AUS still on the ground at their origin 15+ minutes past their scheduled departure while the stop was in effect. Held time is minutes past the scheduled departure.
- Held at origin
- 0
- Average held
- —
- Longest
- —
No inbound flight has been seen held at its origin during this stop.
Impact by region
Delayed arrivals by the air traffic control center they departed from. Held: departures from that center were stopped.
| Center | Status | Delayed |
|---|---|---|
| Fort Worth Center (ZFW) | Held | 1 |
| Houston Center (ZHU) | Held | 1 |
| Albuquerque Center (ZAB) | Held | 0 |
| Outside the US centers | Not held | 1 |
| Denver Center (ZDV) | Not held | 1 |
Timeline
Every change published while the ground stop was in effect, as seen each minute.
Ground stop issued at AUS for runway construction, until 1:15 pm CST. Departures held from ZHU, ZFW, ZAB.
Ground stop ended after 56 min.
Advisories
The air traffic control advisories issued for this ground stop, as published.
ATCSCC ADVZY 049 AUS/ZHU 11/16/2026 CDM GROUND STOP
CTL ELEMENT: AUS ELEMENT TYPE: APT ADL TIME: 1809Z GROUND STOP PERIOD: 16/1754Z - 16/1915Z DEP FACILITIES INCLUDED: (Manual) ZHU ZFW ZAB PREVIOUS TOTAL, MAXIMUM, AVERAGE DELAYS: 0 / 0 / 0 NEW TOTAL, MAXIMUM, AVERAGE DELAYS: 534 / 70 / 44 PROBABILITY OF EXTENSION: MEDIUM IMPACTING CONDITION: RWY-TAXI / CONSTRUCTION COMMENTS: ADDITIONAL CONSTRAINT LOW CEILINGSOriginal advisory ↗